1000+ APK App - Download Google Pinyin Input 3.1.0.61299515 APK Android for Your Smart Phones.
Current Version: 3.1.0.61299515
Requires Android: Varies with device
Category: Tools
v3.1.0.61299515 update:
New features:
- Supports popular shuangpin schemes
- Gesture input on pinyin 9 key keyboard
- Emoji keyboard on Android 4.4 or newer
- Better prediction quality
- Multiple characters recognition on handwriting keyboard
- Adds an option to hide language switch key
Overview:
Gesture typing for Chinese is available now!
The Google Pinyin Input is an input method optimized for typing Chinese on Android.
The app offers a variety of methods for fast and easy input of Chinese characters.
Key features:
– QWERTY keyboard with gesture typing and intelligent correction (new)
– Fuzzy pinyin (new)
– Optimized UI for different screen sizes
– 9 key keyboard
– Latin keyboard
– Voice input
– Handwriting input
The app supports both simplified and traditional Chinese characters, as well as punctuation, emoticons, Latin characters and digits. Voice input is network-based in order to provide highly accurate matches.
Note: To be used on your Android device, the IME must be enabled in “Settings” → “Language & keyboard settings”.
For typing Cantonese, you could download the Google Cantonese Input:
https://play.google.com/store/apps/details?id=com.google.android.apps.inputmethod.cantonese
For typing traditional Chinese by Zhuyin or Cangjie, you could download the Google Zhuyin Input:
https://play.google.com/store/apps/details?id=com.google.android.apps.inputmethod.zhuyin

Tags : Google Pinyin Input 3.1.0.61299515 Android APK, Data, Mod, Free, Download, Samsung, HTC, Sony, LG, Huawei, Motorola and all other Android Phones.